Port Moody - Recreation Chiller Replacement Project
Sector: Water Supply and Storage • Location: British Columbia, Canada
Source: Infrastructure Canada
The project includes replacement of a chiller at the Port Moody Recreation arena, to reduce the risk of ammonia discharge in the event of a catastrophic failure. The project will address the need for a chiller replacement in Port Moody to mitigate the incident in Fernie B.C. in 2017, which resulted in multiple fatalities. The City understands that the replacement of the chillers will afford the ab
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project includes replacement of a chiller at the Port Moody Recreation arena, to reduce the risk of ammonia discharge in the event of a catastrophic failure. The project will address the need for a chiller replacement in Port Moody to mitigate the incident in Fernie B.C. in 2017, which resulted in multiple fatalities. The City understands that the replacement of the chillers will afford the ability to reduce the ammonia charge substantially, thereby lowering the risk to staff and residents in the event of a catastrophic failure and release of ammonia into the atmosphere. In 2018, there was presence of ammonia found in the brine sample taken from Port Moody’s Olympic area. Technical Safety BC was advised immediately and ordered the shutdown of the affected chiller. The project works include: -refrigeration equipment, including 2 chillers, brine pumps and associated piping and install; -mechanical equipment (condenser water treatment system); -structural equipment; -building envelope modifications; -electrical and controls upgrades; and, - all related works. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
