Port of Acu I LNG-to-Power plant

The status, timeline and source of this project. A free account opens every field.

Source: World Bank Group

Project
Active

The project involves the development, construction and operation of a 1.298 GW integrated liquefied natural gas to power (LNG-to-power) plant, located at Complex of Port of Açu, in Rio de Janeiro in Brazil. The project also includes the construction of an LNG import marine terminal, a transmission line, and the expansion of an existing substation. plant will be linked to Brazil’s electrical grid -

Status
Prospective
Sector
Water Supply and Storage, LNG, Natural Gas, Hydro, Oil and Gas, Power Generation (CCGT), Seaport, Power Transmission, Government, Commercial
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Port of Acu I LNG-to-Power plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Port of Acu I LNG-to-Power plant” is an infrastructure initiative in the Water Supply and Storage sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project involves the development, construction and operation of a 1.298 GW integrated liquefied natural gas to power (LNG-to-power) plant, located at Complex of Port of Açu, in Rio de Janeiro in Brazil. The project also includes the construction of an LNG import marine terminal, a transmission line, and the expansion of an existing substation. plant will be linked to Brazil’s electrical grid - the National Interconnected System (SIN). The SPV is UTE GNA I Geração de Energia. It is 33% owned by Siemens and 67% owned by Gas Natural Açu, which in turn is owned by Prumo Logística SA (Brazil, 70%) and BP (30%). The total project cost is BRL 4.5 billion or around $ 1.2 billion. The debt financing comes in 2 tranches. International Finance Corporation (IFC) provides 15-year loan of $ 288 million. BRL 1.76 billion or $ 475 million come from a partnership between Brazilian development bank BNDES and KfW IPEX-Bank, the latter providing a guarantee. KfW IPEX-Bank is supported by the German Export Credit Agency Euler Hermes Aktiengesellschaft. Financing was announced on 3 April 2019 and signed on 15 March 2019; however the project reached financial close in August 2019. Start of commercial operations is expected in 2021 and the plant will help to reduce the country’s carbon footprint with around 139 thousand tons of CO2 equivalent emissions annually. The https://www.kfw-ipex-bank.de/Presse/News/News-Details_515136-2.html https://ifcextapps.ifc.org/IFCExt/Pressroom/IFCPressRoom.nsf/0/00D11DDE4F7CE548852583D1004AFD05 https://www.gtreview.com/news/americas/bndes-partners-with-kfw-to-finance-its-first-lng-thermoelectric-plant/ https://www.bp.com/content/dam/bp-country/en_br/factsheet.pdf https://ijglobal.com/articles/137391/loan-signed-for-brazilian-power-complex https://ijglobal.com/articles/139125/brazils-lng-to-power-project-reaches-fc

Original sector

Energy

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, LNG, Natural Gas, Hydro, Oil and Gas, Power Generation (CCGT), Seaport, Power Transmission, Government, Commercial

Article published date

2024-09-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project