logo

Port of Gijón

Sector: Hydro • Location: Spain

Source: FCC Construction

Project
Closed

The work has basically consisted of the construction of a new shelter dam that starts from Cabo de Torres and has a total length of 3,834 meters, which has allowed the generation of 145 ha of land surface and 140 ha of sheltered water surface.A terminal has been designed for the unloading of solid bulks that, with 1,250 meters of berthing line and depths of up to 27 meters, will allow the simultan

Project Information FAQ

Project Information

3 Q
The project “Port of Gijón” is an infrastructure initiative in the Hydro sector, located in Spain. Taiyo aggregates data on it from FCC Construction.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The work has basically consisted of the construction of a new shelter dam that starts from Cabo de Torres and has a total length of 3,834 meters, which has allowed the generation of 145 ha of land surface and 140 ha of sheltered water surface.A terminal has been designed for the unloading of solid bulks that, with 1,250 meters of berthing line and depths of up to 27 meters, will allow the simultaneous berthing of three bulk carriers of 230,000 DWT and 20 meters of draft.The new terminal has a width of 400 meters and a discharge and storage capacity of iron ore and coal of 25 and 2 million tons respectively.In addition to the construction of the new shelter dam, the perimeter dams of the new surface to be reclaimed from the sea, the filling of the space between the protection dams and the demolition of the current shoulder of the Príncipe de Asturias dam, has been carried out. in order to communicate the previous port area with that obtained after the expansion.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Low

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data