logo

Port of Miami Tunnel

Sector: Bridge • Location: Florida, United States of America

Source: Federal Highway Administration (FHWA)

Project
Close

The Port of Miami Tunnel improves access to and from the Port of Miami, serving as a dedicated roadway connector linking the Port (located on an island in Biscayne Bay) with the MacArthur Causeway (State Road A1A - which connects Miami to Miami Beach) and I-395 on the mainland. Previously the Port was linked to the mainland only by the Port Bridge. The tunnel: (i) improves access to the Port helpi

Project Information FAQ

Project Information

5 Q
The project “Port of Miami Tunnel” is an infrastructure initiative in the Bridge sector, located in Florida, United States of America. Taiyo aggregates data on it from Federal Highway Administration (FHWA).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Close

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Port of Miami Tunnel improves access to and from the Port of Miami, serving as a dedicated roadway connector linking the Port (located on an island in Biscayne Bay) with the MacArthur Causeway (State Road A1A - which connects Miami to Miami Beach) and I-395 on the mainland. Previously the Port was linked to the mainland only by the Port Bridge. The tunnel: (i) improves access to the Port helping to keep it competitive and efficient, (ii) improves traffic safety in downtown Miami by removing cargo trucks and cruise line buses from congested city streets, and (iii) facilitates ongoing and future development plans in and around downtown Miami. The project includes a tunnel under the Main Channel (the shipping channel between Dodge and Watson Islands), roadway work on Dodge Island and Watson Island/MacArthur Causeway and widening the MacArthur Causeway Bridge. Twin tubes, each 3,900 feet long and 41 feet in diameter, reach a depth of 120 feet below the water. The project has been developed as a public-private partnership with Miami Access Tunnel, LLC (MAT). The state agreed to pay for approximately 50 percent of the capital costs (design and construction) and all operations and maintenance, while the remaining 50 percent of the capital costs is provided by the local governments. Under the concession agreement, FDOT paid MAT a total of $100 million in milestone payments during the construction period between 2010 and 2013 and a $350 million final acceptance payment upon construction completion. This is followed by 30 years of availability payments during the operating period from a combination of federal and state funds. The annual payment is $32.479 million (2009$), with adjustments for inflation. Deductions are made from this amount if MAT's operation of the facility does not meet prescribed performance standards.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data