logo
ProjectClosed

PORT

Closed · Belgium

Source: World Bank Group

The Ports and Waterways Project in Belgium will provide financing for the modernization of the Belgian transport system. This project will consist of completion of the Baudouin at the Port of Antwerp; southern and western sections of the Ring Canal, which will be constructed around the City of Ghent; the Baudour-Blaton section of the Nimry-Blaton- Peronnes Canal in the Wilestern Hainaut industrial

Status
Closed
Sector
Water Supply and Storage, Manufacturing (Industrial), Seaport, Government, Hydro
Location
Belgium
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about PORT

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “PORT” is an infrastructure initiative in the Water Supply and Storage sector, located in Belgium. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Ports and Waterways Project in Belgium will provide financing for the modernization of the Belgian transport system. This project will consist of completion of the Baudouin at the Port of Antwerp; southern and western sections of the Ring Canal, which will be constructed around the City of Ghent; the Baudour-Blaton section of the Nimry-Blaton- Peronnes Canal in the Wilestern Hainaut industrial area; improvement on the Charleroi-Seneffe section of the Brussels-Charleroi Canal; and the construction of a dam, and lock system at Neuville-sous- Huy on the Namur-Liege section of the Upper Meuse. There is a need to increase the capacity of many sections of the canals, which have not been modernized since their construction in the nineteenth century. The older stretches cannot accommodate barges larger than 300 tons, and traffic along them is made slower and more expensive by frequent locks and curves, obsolete hand-operated bridges, and other technical limitations. The cost of moving traffic on routes whose traffic is limited by the old sections is about twice as high as on the modern sections.

Original sector

Transportation

Location

Country

Belgium

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Manufacturing (Industrial), Seaport, Government, Hydro

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project