Portables Upgrades at Highgrove ES
Sector: Water Supply and Storage • Location: Riverside, California, United States of America
Source: Dodge
Cut and remove asphalt around portable and ramps as needed. 2. Remove 5 Ramps. 3. Electrical disconnection, and re-connection when complete. 4. Data disconnection, and re-connection when complete. 5. Move one container and replace when complete. 6. Raise 5 - 24x40 DSA building P20, P21, P25, P29 and P30 7. Remove all old lumber and re-set 24x40 building on new wood foundation Block and Level, Like
- Status
- Closed
- Sector
- Water Supply and Storage, Forest Products and Packaging, Government, Commercial, Road, Seaport, Power Generation (CCGT)
- Location
- Riverside, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Portables Upgrades at Highgrove ES
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Cut and remove asphalt around portable and ramps as needed. 2. Remove 5 Ramps. 3. Electrical disconnection, and re-connection when complete. 4. Data disconnection, and re-connection when complete. 5. Move one container and replace when complete. 6. Raise 5 - 24x40 DSA building P20, P21, P25, P29 and P30 7. Remove all old lumber and re-set 24x40 building on new wood foundation Block and Level, Like for Like. 8. Disposal of all debris. 9. New asphalt around ramp and building. 10.Repair any dama... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Riverside |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Forest Products and Packaging, Government, Commercial, Road, Seaport, Power Generation (CCGT) |
Article published date | 2025-04-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
