Porter Avenue Improvements
Sector: Water Supply and Storage • Location: Des Moines, Iowa, United States of America
Source: Dodge
The improvement includes Hot Mix Asphalt (HMA) and Portland Cement Concrete (PCC) roadway pavement, sidewalk, driveways, pavement removal, storm sewer, water main, temporary traffic control, erosion control, retaining walls, surface restoration, and other incidental items, all in accordance with the contract documents including Plan File No. 667-192/237, located along Porter Avenue between SW 9th
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Government, Road, Seaport, Car parking, Commercial, Waste Processing and Treatment, Automotive
- Location
- Des Moines, Iowa, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Porter Avenue Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The improvement includes Hot Mix Asphalt (HMA) and Portland Cement Concrete (PCC) roadway pavement, sidewalk, driveways, pavement removal, storm sewer, water main, temporary traffic control, erosion control, retaining walls, surface restoration, and other incidental items, all in accordance with the contract documents including Plan File No. 667-192/237, located along Porter Avenue between SW 9th Street and South Union Street; the intersection of E. Jefferson Avenue and E. Lay Street; and the... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Iowa |
City | Des Moines |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Government, Road, Seaport, Car parking, Commercial, Waste Processing and Treatment, Automotive |
Article published date | 2025-02-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
