Porter Meadows Subdivision
Sector: Water Supply and Storage • Location: Bay City, Texas, United States of America
Source: Dodge
The work generally consists of approximately 13,357 square yards of concrete pavement with curb on 6-inch lime stabilized subgrade; 4,250 feet of 2" to12" waterline with valves, fittings, service lines and fire hydrants; 2,723 feet of 6" and 8" sanitary sewer lines with manholes and service lines; 4,248 feet of reinforce concrete storm sewer pipe from 18" to 48" with inlets, junction boxes, manhol
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Bid Results |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The work generally consists of approximately 13,357 square yards of concrete pavement with curb on 6-inch lime stabilized subgrade; 4,250 feet of 2" to12" waterline with valves, fittings, service lines and fire hydrants; 2,723 feet of 6" and 8" sanitary sewer lines with manholes and service lines; 4,248 feet of reinforce concrete storm sewer pipe from 18" to 48" with inlets, junction boxes, manholes and safety end treatments; 102 feet of 8' x 3' concrete box culvert, 79,731 cubic yards of det... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
