logo
ProjectBid Results

Porter Meadows Subdivision

One of 10,000+ projects Taiyo tracks in Texas.

Source: Dodge

The work generally consists of approximately 13,357 square yards of concrete pavement with curb on 6-inch lime stabilized subgrade; 4,250 feet of 2" to12" waterline with valves, fittings, service lines and fire hydrants; 2,723 feet of 6" and 8" sanitary sewer lines with manholes and service lines; 4,248 feet of reinforce concrete storm sewer pipe from 18" to 48" with inlets, junction boxes, manhol

Status
Closed
Sector
Water Supply and Storage, Cement, Government, Commercial, Seaport, Waste Processing and Treatment, Road
Location
Bay City, Texas, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Porter Meadows Subdivision

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Porter Meadows Subdivision” is an infrastructure initiative in the Water Supply and Storage sector, located in Bay City, Texas, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Bid Results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The work generally consists of approximately 13,357 square yards of concrete pavement with curb on 6-inch lime stabilized subgrade; 4,250 feet of 2" to12" waterline with valves, fittings, service lines and fire hydrants; 2,723 feet of 6" and 8" sanitary sewer lines with manholes and service lines; 4,248 feet of reinforce concrete storm sewer pipe from 18" to 48" with inlets, junction boxes, manholes and safety end treatments; 102 feet of 8' x 3' concrete box culvert, 79,731 cubic yards of det...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Texas

City

Bay City

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Cement, Government, Commercial, Seaport, Waste Processing and Treatment, Road

Article published date

2025-03-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project