Porter Park Site Improvements REBID
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
ORK COVERED BY CONTRACT DOCUMENTS A. Work of the Contract is for the construction at Porter Park located at 23447 Owens Road, Porter, Texas. The detailed project description of the Work. 1. Clear and grubbing for 10 acres of all obstructions shown on the Drawings. 2. Remove miscellaneous obstructions to include, but not limited to, remains of structures, foundations, floor slabs, concrete, brick,
- Status
- Closed
- Sector
- Power Transmission, Cement, Car parking, Road, Government, Water Supply and Storage, Waste Processing and Treatment, Power Generation (CCGT), Forest Products and Packaging, Seaport, Automotive, Manufacturing (Industrial), Commercial
- Location
- Porter, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Porter Park Site Improvements REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | ORK COVERED BY CONTRACT DOCUMENTS A. Work of the Contract is for the construction at Porter Park located at 23447 Owens Road, Porter, Texas. The detailed project description of the Work. 1. Clear and grubbing for 10 acres of all obstructions shown on the Drawings. 2. Remove miscellaneous obstructions to include, but not limited to, remains of structures, foundations, floor slabs, concrete, brick, lumber, plastic, septic tank drain fields, abandoned utility pipes or conduits, equipment, fences... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Porter |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Cement, Car parking, Road, Government, Water Supply and Storage, Waste Processing and Treatment, Power Generation (CCGT), Forest Products and Packaging, Seaport, Automotive, Manufacturing (Industrial), Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
