Porthos CCS Project
Sector: Energy • Location: Rotterdam, Netherlands
Source: EnergyNow
The Port of Rotterdam CCS project (Porthos) will capture carbon from Air Liquide, Air Products, ExxonMobil, and Shell facilities by installing pipeline infrastructure to transport CO2 to empty gas fields in the North Sea for permanent storage. Construction began in 2024 and operations are slated to start in 2026.
- Status
- Under Construction
- Sector
- Energy
- Location
- Rotterdam, Netherlands
- Updated
- 22 Jul 2026
- Source
- EnergyNow
ConstructChat
Ask ConstructChat about Porthos CCS Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Port of Rotterdam CCS project (Porthos) will capture carbon from Air Liquide, Air Products, ExxonMobil, and Shell facilities by installing pipeline infrastructure to transport CO2 to empty gas fields in the North Sea for permanent storage. Construction began in 2024 and operations are slated to start in 2026. |
Original sector | Energy |
Location
Country | Netherlands |
City | Rotterdam |
Source
Source | EnergyNow |
URL |
More Details
Record type | Project |
Article published date | 2026-05-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
