Porto das Aguas Thermal Power Plant Phase II

Sector: Commercial • Location: Brazil

Source: World Bank Group

Project
Active

The Brazilian company Cerradinho Bioenergia S.A. (Grupo Cerradinho) was granted an authorization to build a 70-MW sugar-cane residue fueled power plant located in the state of Goias (municipality of Chapadao do Ceu). The power plant was named UTE Porto das Aguas.

In January 2009, the company signed a 30-year contract with the regulatory agency ANEEL allowing the company to build and operate th

Project Information FAQ

Project Information

5 Q
The project “Porto das Aguas Thermal Power Plant Phase II” is an infrastructure initiative in the Commercial sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Brazilian company Cerradinho Bioenergia S.A. (Grupo Cerradinho) was granted an authorization to build a 70-MW sugar-cane residue fueled power plant located in the state of Goias (municipality of Chapadao do Ceu). The power plant was named UTE Porto das Aguas. In January 2009, the company signed a 30-year contract with the regulatory agency ANEEL allowing the company to build and operate the power plant. In 2008, UTE Porto das Aguas Phase I (ID# 5567) had been granted 30-year power purchase agreements to sell electricity to distribution companies starting in 2010. In 2011, the company was again granted power purchase agreements to sell electricity to distribution companies starting in 2016. This required the power plant to expand its capacity to 160 MW. The investment committed to the expansion was estimated at US$ 46.4 million (BRL 154.9 million). Construction works commenced in May 2015 and were nearly concluded by December 2015. The company was granted the right to take part in the government program called Regime Especial de Incentivos para o Desenvolvimento da Infra-Estrutura (Reidi). Companies selected to take part in this program were given tax cuts in the acquisition of capital equipment and construction material acquired both in the domestic and international markets (this incentive represented a cost reduction of about 9.25%). In addition, the company was allowed to use accelerated depreciation methods of accounting for construction expenditures. In August 2016, the IFC granted a US$ 47 million loan to Cerradinho Bioenergia, so that the company would finish the construction works and invest in its sugar-cane processing facilities.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data