logo

Porto das Aguas Thermal Power Plant Phase II

Sector: Water Supply and Storage • Location: Brazil

Source: World Bank Group

Project
Active

The Brazilian company Cerradinho Bioenergia S.A. (Grupo Cerradinho) was granted an authorization to build a 70-MW sugar-cane residue fueled power plant located in the state of Goias (municipality of Chapadao do Ceu). The power plant was named UTE Porto das Aguas.

In January 2009, the company signed a 30-year contract with the regulatory agency ANEEL allowing the company to build and operate th

Status
Prospective
Sector
Water Supply and Storage, Commercial, Power Generation (CCGT), Government, Geothermal, Steel, Biomass, Manufacturing (Industrial)
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Porto das Aguas Thermal Power Plant Phase II

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Porto das Aguas Thermal Power Plant Phase II” is an infrastructure initiative in the Water Supply and Storage sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Brazilian company Cerradinho Bioenergia S.A. (Grupo Cerradinho) was granted an authorization to build a 70-MW sugar-cane residue fueled power plant located in the state of Goias (municipality of Chapadao do Ceu). The power plant was named UTE Porto das Aguas. In January 2009, the company signed a 30-year contract with the regulatory agency ANEEL allowing the company to build and operate the power plant. In 2008, UTE Porto das Aguas Phase I (ID# 5567) had been granted 30-year power purchase agreements to sell electricity to distribution companies starting in 2010. In 2011, the company was again granted power purchase agreements to sell electricity to distribution companies starting in 2016. This required the power plant to expand its capacity to 160 MW. The investment committed to the expansion was estimated at US$ 46.4 million (BRL 154.9 million). Construction works commenced in May 2015 and were nearly concluded by December 2015. The company was granted the right to take part in the government program called Regime Especial de Incentivos para o Desenvolvimento da Infra-Estrutura (Reidi). Companies selected to take part in this program were given tax cuts in the acquisition of capital equipment and construction material acquired both in the domestic and international markets (this incentive represented a cost reduction of about 9.25%). In addition, the company was allowed to use accelerated depreciation methods of accounting for construction expenditures. In August 2016, the IFC granted a US$ 47 million loan to Cerradinho Bioenergia, so that the company would finish the construction works and invest in its sugar-cane processing facilities.

Original sector

Energy

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Commercial, Power Generation (CCGT), Government, Geothermal, Steel, Biomass, Manufacturing (Industrial)

Article published date

2024-09-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project