logo

Porto Primavera - Dourados - Imbirissu Transmission Line

Sector: Power Generation (CCGT) • Location: Brazil

Source: World Bank Group

Project
Active

In March 2005, the consortium Porto Primavera Transmissora was officially awarded a contract by ANEEL, Brazil’s power regulator, to construct, operate and maintain a 490km, 230Kv transmission line in Mato Grosso do Sul. The project was designed to expand and improve the safety of the power supply in Mato Grosso do Sul and strengthen interconnectivity between the southern regions. Porto Primavera T

Status
Prospective
Sector
Power Generation (CCGT), Government, Commercial
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Porto Primavera - Dourados - Imbirissu Transmission Line

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Porto Primavera - Dourados - Imbirissu Transmission Line” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In March 2005, the consortium Porto Primavera Transmissora was officially awarded a contract by ANEEL, Brazil’s power regulator, to construct, operate and maintain a 490km, 230Kv transmission line in Mato Grosso do Sul. The project was designed to expand and improve the safety of the power supply in Mato Grosso do Sul and strengthen interconnectivity between the southern regions. Porto Primavera Transmissora was equally owned by Isolux SA, Elecnor SA and Cobra Instalaciones y Servicios SA. The project was previously tendered on September 30, 2004 at a public auction. The winning bidder was Isolux SA with a bid of 24% below annual maximum revenues. In December 2006, BNDES, the Brazilian development bank, financed US $90.6 million for the construction, operation and maintenance of the transmission line. Total investment requirements were estimated at US $170.2 million. Indirect financing was provided by three different groups of private banks (Banco Bradesco S.A., Banco Votorantim S.A., Banco Santander Brasil S.A. and Banco BNP Paribas Brasil S.A). In a similar fashion, BNDES also financed #3777 Cuiaba – Itumbiara Transmission Line and #4352 Vila do Conde Transmissora de Energia Ltd. MIGA has issued guarantees of $20.6 million to Cobra Instalaciones y Servicios SA to cover its US $22.9 million equity investment. The coverage is against the risk of breach of contract and transfer restriction for up to 15 and 10 years, respectively. In March 2010, the shareholding structure was again modified when a Chinese state – owned company, SGID, acquired Porto Primavera Transmissora de Energia and other transmission projects from Plena Transmissora de Energia (Isolux, 33,3%; Elecnor, 33,3%; Cobra Instalaciones y Servicios, 33,3%), which held 100% of the shares of the project company at the time the transaction took place. SGID invested US$ 1.72 billion (BRL 3.1 billion) in the acquisition of Plena Transmissora de Energia. Operations commenced in July 2011.

Original sector

Energy

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Government, Commercial

Article published date

2024-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project