In March 2005, the consortium Porto Primavera Transmissora was officially awarded a contract by ANEEL, Brazil’s power regulator, to construct, operate and maintain a 490km, 230Kv transmission line in Mato Grosso do Sul. The project was designed to expand and improve the safety of the power supply in Mato Grosso do Sul and strengthen interconnectivity between the southern regions. Porto Primavera T

Project Information FAQ

Project Information

5 Q
The project “Porto Primavera - Dourados - Imbirissu Transmission Line” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In March 2005, the consortium Porto Primavera Transmissora was officially awarded a contract by ANEEL, Brazil’s power regulator, to construct, operate and maintain a 490km, 230Kv transmission line in Mato Grosso do Sul. The project was designed to expand and improve the safety of the power supply in Mato Grosso do Sul and strengthen interconnectivity between the southern regions. Porto Primavera Transmissora was equally owned by Isolux SA, Elecnor SA and Cobra Instalaciones y Servicios SA. The project was previously tendered on September 30, 2004 at a public auction. The winning bidder was Isolux SA with a bid of 24% below annual maximum revenues. In December 2006, BNDES, the Brazilian development bank, financed US $90.6 million for the construction, operation and maintenance of the transmission line. Total investment requirements were estimated at US $170.2 million. Indirect financing was provided by three different groups of private banks (Banco Bradesco S.A., Banco Votorantim S.A., Banco Santander Brasil S.A. and Banco BNP Paribas Brasil S.A). In a similar fashion, BNDES also financed #3777 Cuiaba – Itumbiara Transmission Line and #4352 Vila do Conde Transmissora de Energia Ltd. MIGA has issued guarantees of $20.6 million to Cobra Instalaciones y Servicios SA to cover its US $22.9 million equity investment. The coverage is against the risk of breach of contract and transfer restriction for up to 15 and 10 years, respectively. In March 2010, the shareholding structure was again modified when a Chinese state – owned company, SGID, acquired Porto Primavera Transmissora de Energia and other transmission projects from Plena Transmissora de Energia (Isolux, 33,3%; Elecnor, 33,3%; Cobra Instalaciones y Servicios, 33,3%), which held 100% of the shares of the project company at the time the transaction took place. SGID invested US$ 1.72 billion (BRL 3.1 billion) in the acquisition of Plena Transmissora de Energia. Operations commenced in July 2011.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data