logo

Posorja Port

Sector: Road • Location: Ecuador

Source: Inter-American Development Bank (IADB)

Project
In Implementation

DPWorld Posorja S.A (the “DPWP” “Company” or “the Borrower”) was awarded in June 2016 a 50-year concession for the development, construction, operation and maintenance of a general purpose deep-water port located at Posorja, about 85 km southwest of Guayaquil, Ecuador (the “Port”).The project will require a total investment of over US$1.0 billion, and will be developed in two phases. The first pha

Project Information FAQ

Project Information

4 Q
The project “Posorja Port” is an infrastructure initiative in the Road sector, located in Ecuador. Taiyo aggregates data on it from Inter-American Development Bank (IADB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

in implementation

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

DPWorld Posorja S.A (the “DPWP” “Company” or “the Borrower”) was awarded in June 2016 a 50-year concession for the development, construction, operation and maintenance of a general purpose deep-water port located at Posorja, about 85 km southwest of Guayaquil, Ecuador (the “Port”).The project will require a total investment of over US$1.0 billion, and will be developed in two phases. The first phase, that will have a footprint of approximately 40 hectares (ha) and was conceived to achieve an annual handling capacity of 800,000 twenty-foot-equivalent units, is expected to be completed by 2019. It includes land acquisition, dredging of a new access channel and the construction of a 400-meter berth and of a 20-kilometer access road. The port will offer a 15-meter draft compared with the current 9.75-meter draft at the existing Guayaquil port.The second phase will expand the project’s footprint to a total of 63 ha due to the construction of in ground additional facilities (out of the scope of the proposed financing). The local government is planning to construct a 2,500 ha industrial park immediately adjacent to the port. Construction of the Project’s access road began in May, 2017.Phase 1 of the Posorja Port project requires a total investment of approximately US$503.8 million. The financial plan is expected to be composed of Equity and Senior Loans comprised by an IIC and IDB A-loans, an IIC B-Loan and Co-Loans from other Development Finance Institutions.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data