logo

Possible Billion Dollar Data Center in Grant County

Sector: Data Center • Location: Cassville (near), Wisconsin, United States

Source: The Daily Reporter

Project
Planned

A proposed data center in Grant County, Wisconsin's Driftless Area, expected to cost between $1 billion and $2 billion, spanning about 500 acres and employing about 50 people. The project is anticipated to generate $5.6 million annually in property tax revenue without requiring tax incentives. The data center would be operated by a major tech company and is being considered near power transmission

Status
Prospective
Sector
Data Center, Power Generation (CCGT)
Location
Cassville (near), Wisconsin, United States of America
Updated
22 Jul 2026
Source
The Daily Reporter

ConstructChat

Ask ConstructChat about Possible Billion Dollar Data Center in Grant County

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Possible Billion Dollar Data Center in Grant County” is an infrastructure initiative in the Data Center sector, located in Cassville (near), Wisconsin, United States. Taiyo aggregates data on it from The Daily Reporter.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A proposed data center in Grant County, Wisconsin's Driftless Area, expected to cost between $1 billion and $2 billion, spanning about 500 acres and employing about 50 people. The project is anticipated to generate $5.6 million annually in property tax revenue without requiring tax incentives. The data center would be operated by a major tech company and is being considered near power transmission lines in Grant County.

Original sector

Construction

Budget

Location

Country

United States of America (USA)

State

Wisconsin

City

Cassville (near)

Source

Source

The Daily Reporter

URL

More Details

Record type

Project

Sector

Data Center, Power Generation (CCGT)

Article published date

2026-04-13

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project