Post 1 Overflow Pipe Replacement
Closed · Illinois · Last reported Jul 2023
Source: Dodge USA
Project consists of removing existing overflow pipe, construction and installation of weir box and overflow pipe from inside ground storage tank to the exterior and mounted to exterior wall of tank. The Work shall be substantially completed no more than forty-five (45) days after Notice to Proceed is given
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Commercial, Waste Processing and Treatment
- Location
- Orland Hills, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Post 1 Overflow Pipe Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project consists of removing existing overflow pipe, construction and installation of weir box and overflow pipe from inside ground storage tank to the exterior and mounted to exterior wall of tank. The Work shall be substantially completed no more than forty-five (45) days after Notice to Proceed is given |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Orland Hills |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Waste Processing and Treatment |
Article published date | 2023-07-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
