Post-Chernobyl Recovery Project
Closed · Belarus
Source: World Bank
The Belarus Post-Chernobyl Recovery Project aims to provide the population residing in the Chernobyl affected area with energy efficient and reliable heat and hot water services in order to improve their living environment. There are three project components. Component 1, the Energy Efficiency Component, improves energy efficiency through upgrading or replacement of heat production and distributio
- Status
- Closed
- Sector
- Road, Water Supply and Storage, Nuclear, Power Generation (CCGT), Oil and Gas, Natural Gas, Geothermal, Residential, Government, Education
- Location
- Belarus
- Updated
- 22 Jul 2026
- Source
- World Bank
ConstructChat
Ask ConstructChat about Post-Chernobyl Recovery Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Belarus Post-Chernobyl Recovery Project aims to provide the population residing in the Chernobyl affected area with energy efficient and reliable heat and hot water services in order to improve their living environment. There are three project components. Component 1, the Energy Efficiency Component, improves energy efficiency through upgrading or replacement of heat production and distribution equipment, and improving thermal insulation and lighting in public buildings. Component 2, the Residential Gas Connections Component, provides household connections to existing gas distribution network to improve heat supply and replace utilization of dirty fuels, including those that may be contaminated with radioactive material. Component 3, Project Implementation and Management Support, includes (a) design and supervision for project investments; (b) staffing, equipment, and training; (c) public information; and (d) auditing. and other fiduciary or technical services. |
Original sector | FY17 - Energy and Extractives |
Budget |
Location
Country | Belarus |
Source
Source | World Bank |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Nuclear, Power Generation (CCGT), Oil and Gas, Natural Gas, Geothermal, Residential, Government, Education |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Belarus
- Velcom
- Yamal – Europe Gas Pipeline
- BELARUS TRANSPORT CONNECTIVITY
- CMG Logistics Park - Phase I, Great Stone Industrial Park, Smolevichy, Minsk
- Reconstruction of the road H 9637 Radkovo-Krasnaya SlobodaGulevichi of Minsk oblast
- M5 Upgrade (Bobruysk - Zhlobin)
- Reconstruction of the Zhlobin-Gomel section of M-5/E 271 Minsk-Gomel highway
- Construction of the section (16.8 km) of the road - bypassing Bobruisk city from km 27.5 of the road P-31 Bobruisk-Mazyr-border of the Ukraine to km 164.5 of the road M-5/E271 Minsk-Gomel
