Post-Chernobyl Recovery Project
Sector: Road • Location: Belarus
Source: World Bank
The Belarus Post-Chernobyl Recovery Project aims to provide the population residing in the Chernobyl affected area with energy efficient and reliable heat and hot water services in order to improve their living environment. There are three project components. Component 1, the Energy Efficiency Component, improves energy efficiency through upgrading or replacement of heat production and distributio
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Belarus Post-Chernobyl Recovery Project aims to provide the population residing in the Chernobyl affected area with energy efficient and reliable heat and hot water services in order to improve their living environment. There are three project components. Component 1, the Energy Efficiency Component, improves energy efficiency through upgrading or replacement of heat production and distribution equipment, and improving thermal insulation and lighting in public buildings. Component 2, the Residential Gas Connections Component, provides household connections to existing gas distribution network to improve heat supply and replace utilization of dirty fuels, including those that may be contaminated with radioactive material. Component 3, Project Implementation and Management Support, includes (a) design and supervision for project investments; (b) staffing, equipment, and training; (c) public information; and (d) auditing. and other fiduciary or technical services. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Road projects in Belarus
- Velcom
- BELARUS TRANSPORT CONNECTIVITY
- Yamal – Europe Gas Pipeline
- CMG Logistics Park - Phase I, Great Stone Industrial Park, Smolevichy, Minsk
- Reconstruction of the road H 9637 Radkovo-Krasnaya SlobodaGulevichi of Minsk oblast
- M5 Upgrade (Bobruysk - Zhlobin)
- Reconstruction of the Zhlobin-Gomel section of M-5/E 271 Minsk-Gomel highway
- Construction of the section (16.8 km) of the road - bypassing Bobruisk city from km 27.5 of the road P-31 Bobruisk-Mazyr-border of the Ukraine to km 164.5 of the road M-5/E271 Minsk-Gomel
