logo

Post-Chernobyl Recovery Project

Sector: Road • Location: Belarus

Source: World Bank Group

Project
Closed

The Belarus Post-Chernobyl Recovery Project aims to provide the population residing in the Chernobyl affected area with energy efficient and reliable heat and hot water services in order to improve their living environment. There are three project components. Component 1, the Energy Efficiency Component, improves energy efficiency through upgrading or replacement of heat production and distributio

Status
Closed
Sector
Road, Water Supply and Storage, Nuclear, Power Generation (CCGT), Oil and Gas, Natural Gas, Geothermal, Residential, Government, Education
Location
Belarus
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Post-Chernobyl Recovery Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Post-Chernobyl Recovery Project” is an infrastructure initiative in the Road sector, located in Belarus. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Belarus Post-Chernobyl Recovery Project aims to provide the population residing in the Chernobyl affected area with energy efficient and reliable heat and hot water services in order to improve their living environment. There are three project components. Component 1, the Energy Efficiency Component, improves energy efficiency through upgrading or replacement of heat production and distribution equipment, and improving thermal insulation and lighting in public buildings. Component 2, the Residential Gas Connections Component, provides household connections to existing gas distribution network to improve heat supply and replace utilization of dirty fuels, including those that may be contaminated with radioactive material. Component 3, Project Implementation and Management Support, includes (a) design and supervision for project investments; (b) staffing, equipment, and training; (c) public information; and (d) auditing. and other fiduciary or technical services.

Original sector

FY17 - Energy and Extractives

Budget

Location

Country

Belarus

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Road, Water Supply and Storage, Nuclear, Power Generation (CCGT), Oil and Gas, Natural Gas, Geothermal, Residential, Government, Education

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project