Post Office Bridge Replacement
One of 10,000+ projects Taiyo tracks in West Virginia.
Source: Dodge
This project consists of the Pre-Cast Box culvert installation approximately 21 foot span over War Creek in Warriormine, WV to replace pre-existing timber deck bridge structure at Warriormine Post Office that was washed away during 2022 flood event.
- Status
- Closed
- Sector
- Water Supply and Storage, Forest Products and Packaging, Government, Road, Bridge, Residential, Waste Processing and Treatment, Commercial
- Location
- Warriormine, West Virginia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Post Office Bridge Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project consists of the Pre-Cast Box culvert installation approximately 21 foot span over War Creek in Warriormine, WV to replace pre-existing timber deck bridge structure at Warriormine Post Office that was washed away during 2022 flood event. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | West Virginia |
City | Warriormine |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Forest Products and Packaging, Government, Road, Bridge, Residential, Waste Processing and Treatment, Commercial |
Article published date | 2025-09-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
