logo
ProjectBidding

Potable Water Conveyance System

Bidding · Idaho · Last reported Jul 2024

Source: Dodge USA

Principle components of work for this Hungry Horse Potable Water Conveyance System essentially includes: 1 Converting test well into a production water well 2 Install new water main from well site location to Hungry Horse Dam 3 Install new water main inside the Hungry Horse Dam and make existing potable water piping connections. 4 Replace existing electrical panels, conductors, and miscellaneous i

Status
Prospective
Sector
Water Supply and Storage, Hydro, Power Generation (CCGT), Commercial, Waste Processing and Treatment
Location
Boise, Idaho, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Potable Water Conveyance System

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Potable Water Conveyance System” is an infrastructure initiative in the Water Supply and Storage sector, located in Boise, Idaho, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Principle components of work for this Hungry Horse Potable Water Conveyance System essentially includes: 1 Converting test well into a production water well 2 Install new water main from well site location to Hungry Horse Dam 3 Install new water main inside the Hungry Horse Dam and make existing potable water piping connections. 4 Replace existing electrical panels, conductors, and miscellaneous items, appurtenances, and devices incidental to or necessary for a sound, secure, complete, and fu...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Idaho

City

Boise

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Hydro, Power Generation (CCGT), Commercial, Waste Processing and Treatment

Article published date

2024-07-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project