logo
ProjectClosed

Potable Well 16

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

OUTFITTING OF A RECENTLY CONSTRUCTED POTABLE WATER WELL IN THE UPPER FLORIDIAN AQUIFER, ENCOMPASSING THE FURNISHING AND INSTALLATION OF A SUBMERSIBLE WELL PUMP, MECHANICAL PIPING, SITE WORK, FENCING, ELECTRICAL AND INSTRUMENTATION, INSTALLATION OF A GENERATOR SUPPLIED BY THE CITY, APPROXIMATELY 510 LF OF 10 RAW WATERMAIN CONNECTING POTABLE WATER WELL #16 TO THE NEW 12 RAW WATERMAIN (DESIGN BY THE

Status
Closed
Sector
Water Supply and Storage, Power Generation (CCGT), Government, Commercial, Waste Processing and Treatment
Location
Flagler Beach, Florida, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Potable Well 16

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Potable Well 16” is an infrastructure initiative in the Water Supply and Storage sector, located in Flagler Beach, Florida, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

OUTFITTING OF A RECENTLY CONSTRUCTED POTABLE WATER WELL IN THE UPPER FLORIDIAN AQUIFER, ENCOMPASSING THE FURNISHING AND INSTALLATION OF A SUBMERSIBLE WELL PUMP, MECHANICAL PIPING, SITE WORK, FENCING, ELECTRICAL AND INSTRUMENTATION, INSTALLATION OF A GENERATOR SUPPLIED BY THE CITY, APPROXIMATELY 510 LF OF 10 RAW WATERMAIN CONNECTING POTABLE WATER WELL #16 TO THE NEW 12 RAW WATERMAIN (DESIGN BY THE DEVELOPER S ENGINEER SEE ATTACHMENT FOR DESIGN DRAWINGS), AND APPROXIMATELY 530 LF OF 12 RAW WATE...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Florida

City

Flagler Beach

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Government, Commercial, Waste Processing and Treatment

Article published date

2024-04-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project