Potegowo Wind

The status, timeline and source of this project. A free account opens every field.

Source: European Bank for Reconstruction and Development (EBRD)

The provision of a senior long-term loan to finance the construction and operation of a wind farm with the total capacity of up to 219.5 MW located in Norther Poland (the “Project”). The Project is expected to be made available to a special purpose company, Potegowo Mashav Sp. z.o.o. (the “borrower”) created to own, construct and operate the wind farm. The Borrower is majority owned by the Israel

Status
Under Construction
Sector
Power Generation (CCGT), Wind, Raw Materials, Commercial, Residential
Location
Poland
Updated
22 Jul 2026
Source
European Bank for Reconstruction and Development (EBRD)

ConstructChat

Ask ConstructChat about Potegowo Wind

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Potegowo Wind” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Poland. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Participants

Not available for this record.

Status

Original status

signed

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The provision of a senior long-term loan to finance the construction and operation of a wind farm with the total capacity of up to 219.5 MW located in Norther Poland (the “Project”). The Project is expected to be made available to a special purpose company, Potegowo Mashav Sp. z.o.o. (the “borrower”) created to own, construct and operate the wind farm. The Borrower is majority owned by the Israel Infrastructure Fund and Helios Energy Investment (jointly the “Sponsors”). In 2021 the Sponsor approached the Bank for additional financing of the extension of Biecino wind farm (additional 8 wind turbines of 2.75MW each) and the construction of Wieliszewo wind farm  (17 wind turbines of 2.2 MW each) in a new location 10 km south of existing wind turbines. The new wind turbines are located in the same general area. The Project was first approved 09 Apr 2019 and extension to be approved in Q2 2021 The Project and subsequent extension are aimed at supporting renewable energy development in Poland and overall decarbonisation of the energy sector. The original ESIA disclosure is below. Additional supplementary disclosure is provide below of the extension. Polish package Site link Full ESIA documentation is available on the company web site. and locally at: Contact: Mayor Andrzej Kordylas And EBRD Warsaw Office ul. 53 Emili Plater Warsaw Financial Centre, 00-113 Warsaw Tel: +48 5205809 Contact Anna Chmielewsa: ChmieleA@ebrd.com Environmental or social enquiries Mr. Grzegorz Borowiecki Project Manager Potegowo Mashav  Sp. z.o.o. Tel: +48 695 666 516 Email: grzegorz.borowiecki@mashavenergia.com

Original sector

Energy

Location

Country

Poland

Source

Source

European Bank for Reconstruction and Development (EBRD)

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Wind, Raw Materials, Commercial, Residential

Article published date

2026-06-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project