Poti Water Supply Project
The status, timeline and source of this project. A free account opens every field.
Source: European Bank for Reconstruction and Development (EBRD)
The project would consist of a sovereign loan of up to EUR 3.5 million, on-lent to the Company to finance improvements in the municipal water supply system by extending is pipeline to a more reliable source. The objective of the project is to enable the City water municipal Company to provide a 24/7 service to Poti inhabitants. The Poti Water and Wastewater Company was established as a limited lia
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Residential
- Location
- Georgia
- Updated
- 22 Jul 2026
- Source
- European Bank for Reconstruction and Development (EBRD)
ConstructChat
Ask ConstructChat about Poti Water Supply Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project would consist of a sovereign loan of up to EUR 3.5 million, on-lent to the Company to finance improvements in the municipal water supply system by extending is pipeline to a more reliable source. The objective of the project is to enable the City water municipal Company to provide a 24/7 service to Poti inhabitants. The Poti Water and Wastewater Company was established as a limited liability municipal enterprise on 25 June 2002. The Company provides water and wastewater services in the City of Poti and the neighbouring communities with a total population of 70,000. It operates a 254 kilometre water network with one treatment plant, 38 pump stations, five potable water storage tanks, a reservoir, and a 45 kilometre sewerage network with 12 pumps. Sovereign loan of up to EUR 3.5 million on-lent to the Company. City of Poti contribution of up to EUR 1 million Grant finance of up to EUR 3.54 million Note: the Donor of the Grant component will be identified at a later stage. The Grant portion is needed in order to keep affordability within acceptable levels. Up to EUR 8 million. Screened B/0. The project offers the opportunity to improve drinking water supply in the City of Poti. Environmental due diligence needs to be carried out to identify current environmental conditions and to predict potential impacts of the rehabilitation of pumping stations and water supply network, and to assess the ability of the project to bring the facilities towards compliance with Georgian and EU environmental standards. It will also assess possible environmental liabilities associated with water facilities. The total Technical Co-operation to support the project includes: |
Original sector | Municipal Infrastructure |
Location
Country | Georgia |
Source
Source | European Bank for Reconstruction and Development (EBRD) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Residential |
Article published date | 2025-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
