Potiguar Sul Transmissao de Energia

Sector: Commercial • Location: Ceara, Brazil

Source: World Bank Group

In May 2013, the Brazilian company NC Energia S.A. (Neoenergia group, a joint-venture of the Spanish company Iberdrola, 39%; the Investment fund PREVI, 49%; and the state-owned bank Banco do Brasil, 12%) was awarded in a competitive bidding process the contract to build and operate the 196-km transmission line connecting CAMPINA GRANDE III - CEARÁ MIRIM II, C2.

Besides NC Energia, no other bidder

Status
Prospective
Sector
Commercial, Cable car, Power Generation (CCGT), Steel, Government, Automotive, Telecommunications, Manufacturing (Industrial)
Location
Ceara, Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Potiguar Sul Transmissao de Energia

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Potiguar Sul Transmissao de Energia” is an infrastructure initiative in the Commercial sector, located in Ceara, Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In May 2013, the Brazilian company NC Energia S.A. (Neoenergia group, a joint-venture of the Spanish company Iberdrola, 39%; the Investment fund PREVI, 49%; and the state-owned bank Banco do Brasil, 12%) was awarded in a competitive bidding process the contract to build and operate the 196-km transmission line connecting CAMPINA GRANDE III - CEARÁ MIRIM II, C2. Besides NC Energia, no other bidder placed offers. The bidding criteria set by the regulatory agency ANEEL was the lowest required annual revenue. Neoenergia presented the lowest offer, a total value of US$ 8 million (BRL 18.8 million), 6.3% below the ceiling set by the regulatory agency. The contract was signed in August 2013 , and the sponsors created the company Potiguar Sul Transmissao de Energia S.A. to lead the project during the 30-year contract period. The sponsor committed to invest US$ 55.7 million (BRL 185.8 million) in the project. In August 2015, BNDES approved a US$ 26.5 million (BRL 88.4 million) loan to finance the project. In October 2015, Potiguar issued US$ 9.5 million (BRL 31.6 million) in long-term bonds. The remaining investment cost was set to be equity-financed. Construction works commenced in November 2014, and commercial operations were expected to begin by August 2016. The company was granted the right to take part in the government program called Regime Especial de Incentivos para o Desenvolvimento da Infra-Estrutura (Reidi). Companies selected to take part in this program were given tax cuts in the acquisition of capital equipment and construction material acquired both in the domestic and international markets (this incentive represented a cost reduction of about 9.25%). In addition, the company was allowed to use accelerated depreciation methods of accounting for construction expenditures.

Original sector

Energy

Budget

Location

Country

Brazil

State

Ceara

Source

Source reliability

High

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Cable car, Power Generation (CCGT), Steel, Government, Automotive, Telecommunications, Manufacturing (Industrial)

Article published date

2023-02-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project