Potter Hill Road Culvert Replacement
Sector: Water Supply and Storage • Location: Taylor, New York, United States of America
Source: Dodge
Work of Contract No. 1 shall include all tools, labor, material and equipment necessary to: Replace the Potter Hill Road culvert over an unnamed tributary to the Mud Creek, including demolition and disposal of existing steel culvert; construction of 26 wide x 7 high x 80 long, 3-sided, precast concrete culvert and wingwalls, including excavation and backfill, disposal of spoil material, subbase, p
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Steel, Government, Commercial, Road, Waste Processing and Treatment, Metal
- Location
- Taylor, New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Potter Hill Road Culvert Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Work of Contract No. 1 shall include all tools, labor, material and equipment necessary to: Replace the Potter Hill Road culvert over an unnamed tributary to the Mud Creek, including demolition and disposal of existing steel culvert; construction of 26 wide x 7 high x 80 long, 3-sided, precast concrete culvert and wingwalls, including excavation and backfill, disposal of spoil material, subbase, paving, topsoil placement, establishment of turf, ditching, dewatering, bypass pumping, environmen... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | Taylor |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Steel, Government, Commercial, Road, Waste Processing and Treatment, Metal |
Article published date | 2025-04-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
