logo

Poultry Processing Facility Upgrades

Sector: Commercial • Location: Canada

Source: Bird Construction

Project
Unknown

This 3,200 m2 addition makes our client one of the largest food processing facilities in the province. The addition expanded the poultry processing plant to include the addition of a drag chiller room, turkey cut and pack area, dry storage/box making rooms, variable retention time (VRT) freezer and related utility rooms. As the facility continued operations throughout construction, Bird adapted al

Project Information FAQ

Project Information

3 Q
The project “Poultry Processing Facility Upgrades” is an infrastructure initiative in the Commercial sector, located in Canada. Taiyo aggregates data on it from Bird Construction.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

unknown

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This 3,200 m2 addition makes our client one of the largest food processing facilities in the province. The addition expanded the poultry processing plant to include the addition of a drag chiller room, turkey cut and pack area, dry storage/box making rooms, variable retention time (VRT) freezer and related utility rooms. As the facility continued operations throughout construction, Bird adapted all of its processes to meet the Canadian Food and Beverage Inspection Standards. The owner-supplied equipment was sourced from international vendors and required CSA approval. To accommodate the equipment approval and installation, as well as the ongoing operations, the Project Team hosted regular meetings with the operations team to minimize impact to operations and to stay on schedule. A dedicated Project Coordinator was assigned to the team to coordinate the equipment with the building utilities and design.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data