POWER - MONI
Closed · Cyprus
Source: World Bank Group
The project consists of: (a) expansion of the Moni generating station with the installation of a fourth 30 MW steam turbo-generator, similar to the three existing units financed with earlier Bank loans; (b) construction of 87 miles of 132/66 kv transmission lines; and (c) expansion of the existing Moni substation with two 45 MVA transformers, and construction of a new substation at Athalassa.
- Status
- Closed
- Sector
- Power Generation (CCGT), Geothermal, Government
- Location
- Cyprus
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about POWER - MONI
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of: (a) expansion of the Moni generating station with the installation of a fourth 30 MW steam turbo-generator, similar to the three existing units financed with earlier Bank loans; (b) construction of 87 miles of 132/66 kv transmission lines; and (c) expansion of the existing Moni substation with two 45 MVA transformers, and construction of a new substation at Athalassa. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | Cyprus |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Geothermal, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
