Power & District Heating Rehabilitation Project
One of 3,141 projects Taiyo tracks in Kyrgyz Republic.
Source: World Bank Group
The main objectives of the Power and District Heating Rehabilitation Project are to support economic growth through rehabilitation and upgrading of the electricity and heat supply infrastructure and to assist the government in restructuring the power and district heating sector. Specific objectives are to: 1) improve the power and district heating system efficiency and reliability; 2) reduce powe
- Status
- Closed
- Sector
- Power Generation (CCGT), Oil and Gas, Wind, Commercial, Government
- Location
- Kyrgyzstan
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Power & District Heating Rehabilitation Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The main objectives of the Power and District Heating Rehabilitation Project are to support economic growth through rehabilitation and upgrading of the electricity and heat supply infrastructure and to assist the government in restructuring the power and district heating sector. Specific objectives are to: 1) improve the power and district heating system efficiency and reliability; 2) reduce power and heat losses; 3) reduce the environmental impact of the power and heat facilities; 4) rehabilitate the existing assets in the power and district heating system; 5) introduce appropriate financial management at Kyrgyz National Energy Holding Company (KNEHC); 6) restructure KNEHC along commercial lines; and 7) attract private sector interest in petroleum exploration and production. The project will finance priority investments in the energy sector. Its components include: 1) for KNEHC: (a) rehabilitation of the Bishkek combined-heat-and-power plant; (b) district heating system rehabilitation; (c) rehabilitation and upgrading of power transmission and distribution facilities; and (d) technical support and training; and 2) for the government: provision of consultant services and training for petroleum exploration promotion. |
Original sector | FY17 - Energy and Extractives,FY17 - Public Administration |
Budget |
Location
Country | Kyrgyzstan |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Oil and Gas, Wind, Commercial, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in Kyrgyz Republic
- IWS Smart Farm
- City of Osh water utility joint venture
- Electricity Supply Digitalization Project
- TALAS TRANSMISSION NETWORK IMPROVEMENT PROJECT
- Upgrade of Rechnaya substation
- Kemin Balykchy Interconnection
- Multisector Activities Support Facility 2025–2030
- Issyk-Kul Environmental Management and Sustainable Tourism Development Project
