Power and Environmental Improvement Project
Sector: Power Generation (CCGT) • Location: Czechia
Source: World Bank Group
The objectives of the project are to improve power plant efficiency; to reduce air pollution in northern Bohemia, and thereby improve the environment and health of the local population; to modernize the transmission system; and to facilitate interconnection of the Czech Power Enterprise (CEZ) and German power grids. These objectives will be accomplished in the context of overall reform of the ener
- Status
- Closed
- Sector
- Power Generation (CCGT), Government
- Location
- Czech Republic
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Power and Environmental Improvement Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The objectives of the project are to improve power plant efficiency; to reduce air pollution in northern Bohemia, and thereby improve the environment and health of the local population; to modernize the transmission system; and to facilitate interconnection of the Czech Power Enterprise (CEZ) and German power grids. These objectives will be accomplished in the context of overall reform of the energy sector. To this end, the project will: (a) reduce total consumption of pollution-causing lignite through power plant efficiency improvements; (b) curtail power plant sulfur dioxide (SO2) emissions by means of flue gas desulfurization; (c) reduce dust and fly-ash pollution from power plants; (d) increase the reliability, efficiency and economy of the CEZ transmission system; and (e) assist in improving investment planning and corporate management and organization. The project includes: (a) installation of equipment and operational improvements at the Prunerov II power station and other large CEZ power plants to reduce lignite consumption; (b) installation of flue gas desulfurization equipment at Prunerov II; (c) improvements and equipment for dust collection,; (d) modernization of five 400-kV substations and construction of a short 400-kV transmission line; and (e) consulting services and staff training. |
Original sector | Energy and Extractives |
Budget |
Location
Country | Czech Republic |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in Czechia
- Mondelez International’s Biscuit Factory Expansion, Opava, Czech Republic
- Energeticke Centrum Kladno, spol. s.r.o.
- Frydek-Mistek Biomass Power Plant
- Caslav Biomass Power Plant
- Northwestern Bohemia Coal Fired Power Plant
- Ledvice Power Station Expansion
- Die Geschichte vom Meusel und dem kleinen Maulwurf
- Treasury of Experiences - Stories of Mystery and Shared History
