POWER (CIRATA II)
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The main objective of the project is to provide economical and environmentally sound expansion of the State Electricity Corporation's (PLN) peaking electricity generating capacity in Java, and improve service reliability. Its components are: (a) implementation of Phase II of the Cirata hydroelectric development on the Citarum River in West Java, consisting of: (i) installation, including turbine
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Hydro, Metal, Steel, Government
- Location
- Indonesia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about POWER (CIRATA II)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The main objective of the project is to provide economical and environmentally sound expansion of the State Electricity Corporation's (PLN) peaking electricity generating capacity in Java, and improve service reliability. Its components are: (a) implementation of Phase II of the Cirata hydroelectric development on the Citarum River in West Java, consisting of: (i) installation, including turbines, generators, governors, regulator and control equipment; (ii) construction of two headrace tunnels, two surge shafts, four steel lined penstock tunnels, and four tailrace tunnels, with associated outlet structures; and (iii) installation of transformers and switchgear for connection to the grid; (b) consulting services for the engineering and construction supervision; (c) studies to upgrade hydrological and environmental data bases, and improve data collection practices; (d) studies to update PLN's hydroelectric inventories, and determine pre-feasibility of selected schemes; (e) studies to identify options to enhance environmental conditions in the existing PLN reservoirs on the Citarum River, and training of PLN staff in environmental management; (f) training of PLN's staff in dam safety and instrumentation monitoring; (g) power sector institutional and regulatory framework studies for the Government of Indonesia (GOI); (h) studies aimed at assisting GOI to determine a long-term strategy for financing power sector investments; and (i) pre-construction stage engineering services. |
Original sector | Energy and Extractives |
Budget |
Location
Country | Indonesia |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Hydro, Metal, Steel, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Indonesia
- Cirebon CoalFired Power Plant Expansion West Java
- Rantau Dedap Geothermal Power Project South Sumatra
- Cirata Floating Photovoltaic Power Plant
- Jatiluhur I Drinking Water Supply System
- Palapa Ring Central Broadband
- Tangguh LNG Expansion Project, Papua Barat Province
- Melaka PSR-2 Refinery
- Petronas RAPID Project, Southern Johor