POWER DEVELOPMENT
Sector: Power Transmission • Location: Viet Nam
Source: World Bank Group
The main objectives of the Power Development Project are to: 1) help meet the rapid growth in electricity demand in the South of Viet Nam through the addition of new gas-fired generating capacity; 2) strengthen the high voltage (HV) transformation capacity in Viet Nam; 3) assist the government in the introduction of private power in the country; 4) strengthen the institutional capacity of Electric
- Status
- Closed
- Sector
- Power Transmission, Power Generation (CCGT), Hydro, Government
- Location
- Vietnam
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about POWER DEVELOPMENT
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The main objectives of the Power Development Project are to: 1) help meet the rapid growth in electricity demand in the South of Viet Nam through the addition of new gas-fired generating capacity; 2) strengthen the high voltage (HV) transformation capacity in Viet Nam; 3) assist the government in the introduction of private power in the country; 4) strengthen the institutional capacity of Electricity of Viet Nam (EVN) through technical assistance and training; and 5) assist in the formulation of a national strategy and master plan for rural electrification. The project will finance the following components: 1) installation of 2x150 megawatt (MW) gas turbines for the first 450 MW Combined Cycle (CC) power block of the Phu My power station; 2) addition of about 900 megavolt-amperes (MVA) of such capacity in other parts of the country; 3) resettlement and compensation of persons affected by the Phu My plant; and 4) consulting services for: (a) project design and supervision for Phu My; (b) development of a Build-Operate-Transfer (BOT) type of arrangement for the second CC power block of Phu My on the basis of competitive bidding; (c) technical assistance and training for EVN managerial staff; (d) master plan for rural electrification; and (e) technical studies for the Dai Ninh hydropower project. |
Original sector | Energy and Extractives,FY17 - Public Administration |
Budget |
Location
Country | Vietnam |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Power Generation (CCGT), Hydro, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in Viet Nam
- Viet Nam: Supporting green and blue infrastructure development and capital market in Viet Nam
- Viet Nam: Supporting infrastructure development and climate financing in Viet Nam with second facility with VPBank
- Ultra-High Voltage Transmission Network
- Utility Management of Industrial Parks and Water Supply Project- Sub-Project 2: Utility Management of Phu An Thanh IP
- Utility Management of Industrial Parks and Water Supply Project- Sub-Project 3: Water Supply to Ben Luc District
- Project for Disaster and Climate Change Countermeasures Using Earth Observation Satellite
- Second Program 135 Phase 2 Support
- Mekong Delta Region Urban Upgrading Project
