POWER DIST-PROGRAM A
Sector: Power Transmission • Location: Brazil
Source: World Bank Group
The Power Distribution Program Project consists of a three-year portion of the Project Companies' five-year expansion programs comprising the rehabilitation and expansion of their transmission and distribution systems. About 20 to 25 percent of the total expenditures will be for rehabilitation. Facilities to be installed include high-voltage connecting lines and related substations, low-voltage di
- Status
- Closed
- Sector
- Power Transmission, Power Generation (CCGT), Government
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about POWER DIST-PROGRAM A
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Power Distribution Program Project consists of a three-year portion of the Project Companies' five-year expansion programs comprising the rehabilitation and expansion of their transmission and distribution systems. About 20 to 25 percent of the total expenditures will be for rehabilitation. Facilities to be installed include high-voltage connecting lines and related substations, low-voltage distribution feeders and transformers and related distribution hardware such as switchgear, meters, etc. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | Brazil |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Power Generation (CCGT), Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project