POWER DISTRIB ECG II

Sector: Power Generation (CCGT) • Location: Ghana

Source: World Bank Group

Project
Closed

The Third Power Project includes the following components: (a) sub-transmission and distribution lines: about 230 circuit km of overhead and about 20 km of underground 33 kV lines; about 6 circuit km of 11 kV overhead lines with about 11 MVA of distribution transformers. About 32 km of low tension distribution lines. (b) Substations: 11 new substations with about 150 MVA of transformer capacity; e

Project Information FAQ

Project Information

5 Q
The project “POWER DISTRIB ECG II” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Ghana. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Third Power Project includes the following components: (a) sub-transmission and distribution lines: about 230 circuit km of overhead and about 20 km of underground 33 kV lines; about 6 circuit km of 11 kV overhead lines with about 11 MVA of distribution transformers. About 32 km of low tension distribution lines. (b) Substations: 11 new substations with about 150 MVA of transformer capacity; expansion of about 6 existing substations with about 60 MVA of additional transformer capacity. (c) Materials and vehicles: equipment and material for rehabilitating the existing sub-transmission and distribution system; heavy, medium and light weight vehicles to replace and/or expand the existing fleet. (d) consultants services: about 105 man-months of engineering services at US$4,400 per man-month to help execute the project and two man-years of assistance to help prepare a power sector study, at an estimated cost of US$100,000.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data