Power Distribution Development Program-for-Results
Sector: Power Transmission • Location: Indonesia
Source: World Bank Group
The development objective of the Power Distribution Development Program for Results (PforR) Project for Indonesia is to increase access to electricity services and to improve the efficiency and reliability of their delivery in selected areas of Indonesia. The PforR program to be supported by the Bank is a geographic slice of the distribution component of the Rencana Usaha Penyediaan Tenaga Listrik
- Status
- Closed
- Sector
- Power Transmission, Forest Products and Packaging, Residential, Power Generation (CCGT), Government
- Location
- Indonesia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Power Distribution Development Program-for-Results
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The development objective of the Power Distribution Development Program for Results (PforR) Project for Indonesia is to increase access to electricity services and to improve the efficiency and reliability of their delivery in selected areas of Indonesia. The PforR program to be supported by the Bank is a geographic slice of the distribution component of the Rencana Usaha Penyediaan Tenaga Listrik (RUPTL) in that it will only cover Indonesia’s Sumatra region out of the national distribution plan for the period 2015-2019. It is also a time slice in that it covers the first five years of the sector expansion plan for the period 2015-2019. PT. Perusahaan Listrik Negara (PERSERO), Indonesia’s power utility (PLN’s) strategy is mobilize substantial private sector resources for generation and to focus its own resources and those from multilateral funding agencies to finance transmission and distribution activities. The program will support implementation of activities designed to achieve PLN’s program goals in five result areas as follows: result area 1: improved access to electricity; result area 2: improved quality of service; result area 3: improved distribution efficiency; result area 4: increased power consumption; and result area 5: improved institutional capacity. |
Original sector | FY17 - Energy and Extractives |
Budget |
Location
Country | Indonesia |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Forest Products and Packaging, Residential, Power Generation (CCGT), Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
