Power Distribution Line Replace SOURCES SOUGHT
One of 10,000+ projects Taiyo tracks in Minnesota.
Source: Dodge USA
This project will replace the main underwater high voltage cable and multiple transformer boxes that run from the mainland to the Kettle Falls district. Pad-mounted switchgear, sectionalizing enclosures, elbow terminations, as well as individual and other associated components will be replaced as needed. An improved level of emergency backup generation for critical loads at Kettle Falls Area will
- Status
- Closed
- Sector
- Power Transmission, Telecommunications, Power Generation (CCGT), Commercial
- Location
- Kabetogama, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Power Distribution Line Replace SOURCES SOUGHT
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project will replace the main underwater high voltage cable and multiple transformer boxes that run from the mainland to the Kettle Falls district. Pad-mounted switchgear, sectionalizing enclosures, elbow terminations, as well as individual and other associated components will be replaced as needed. An improved level of emergency backup generation for critical loads at Kettle Falls Area will be installed. The current line and transformer boxes were installed in 1987 and is an underwater ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Kabetogama |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Telecommunications, Power Generation (CCGT), Commercial |
Article published date | 2024-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
