logo

POWER DISTRIBUTION

Sector: Mass Transit • Location: Honduras

Source: World Bank Group

Project
Closed

By expanding ENEE's interconnected system, the project would extend the availability of electricity beyond the few zones already served to areas of growing economic importance now being inadequately supplied from isolated small generating plants. The connection from Rio Lindo to the Sula Valley and the Atlantic coast with a 138 kV line would supply power for the agricultural and industrial needs o

Status
Closed
Sector
Mass Transit, Rail, Power Generation (CCGT), Manufacturing (Industrial), Wind, Raw Materials, Hydro, Government
Location
Honduras
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about POWER DISTRIBUTION

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “POWER DISTRIBUTION” is an infrastructure initiative in the Mass Transit sector, located in Honduras. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

By expanding ENEE's interconnected system, the project would extend the availability of electricity beyond the few zones already served to areas of growing economic importance now being inadequately supplied from isolated small generating plants. The connection from Rio Lindo to the Sula Valley and the Atlantic coast with a 138 kV line would supply power for the agricultural and industrial needs of a fertile and economically active area. Other important 69 kV connections would be from San Pedro Sula, the country's largest industrial town, to the port of Puerto Cortes; from the port of La Ceiba to the Aguan Valley, as yet relatively undeveloped, where promising agricultural schemes are already or soon to be under way; and from the capital of Tegucigalpa to the southern zone, which is slated to receive some priority in national development. The project would also include installation of a 15 MW gas turbine in Tegucigalpa, a training program, feasibility studies on hydro projects and a tariff study.

Original sector

(Historic)Electric Power & Other Energy

Location

Country

Honduras

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Mass Transit, Rail, Power Generation (CCGT), Manufacturing (Industrial), Wind, Raw Materials, Hydro, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project