Power Efficiency Revolution For Embedded Computing Technologies (PERFECT)
The status, timeline and source of this project. A free account opens every field.
Source: Grants.gov
Amendment 04: The purpose of this Amendment is to revise the DARPA Program Manager listed in the BAA. See the changes, highlighted in yellow in the conformed attached DARPA-BAA-12-24.
Amendment 03: The purpose of this amendment is to revise the full proposal due date as highlighted in yellow in the attached conformed DARPA-BAA-12-24 document.Amendment 02: The purpose of this amendment is to inc
- Status
- Closed
- Sector
- Power Generation (CCGT), Aerospace & Defense, Government, Commercial, Residential
- Location
- United States of America
- Updated
- 22 Jul 2026
- Source
- Grants.gov
ConstructChat
Ask ConstructChat about Power Efficiency Revolution For Embedded Computing Technologies (PERFECT)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | archived |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Amendment 04: The purpose of this Amendment is to revise the DARPA Program Manager listed in the BAA. See the changes, highlighted in yellow in the conformed attached DARPA-BAA-12-24. Amendment 03: The purpose of this amendment is to revise the full proposal due date as highlighted in yellow in the attached conformed DARPA-BAA-12-24 document.Amendment 02: The purpose of this amendment is to incorporate language regarding the available budget for this program. See the added language highlighted in yellow in the attached conformed DARPA-BAA-12-24 document. Amendment 01: The purpose of this amendment is to reflect that all abstract submissions must be made through TFIMS and to provide a link to the FAQ. See the changes as highlighted in yellow in the attached conformed DARPA-BAA-12-24.Originial synopsis below.The goal of the Power Efficiency Revolution For Embedded Computing Technologies (PERFECT) programis to provide the technologies and techniques to overcome the power efficiency barriers that currently constrain embedded computing systems capabilities and limit the potential of future embedded systems.See full DARPA-BAA-12-24 document attached. |
Location
Country | United States of America (USA) |
Source
Source reliability | High |
Source | Grants.gov |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Aerospace & Defense, Government, Commercial, Residential |
Article published date | 2023-06-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
