POWER EXPANSION

Sector: Power Generation (CCGT) • Location: Nicaragua

Source: World Bank Group

Project
Closed

The Eighth Power Project includes: (1) construction of a generating plant at Puerto Somoza, comprising two steam-electric generating units with an aggregate generating capacity of about 100 MW, fuel unloading and storage facilities, a substation, and personnel housing; (2) construction of about 105 km of 230 kV single-circuit transmission lines; (3) construction of a 230/138 kV substation at Tisca

Project Information FAQ

Project Information

5 Q
The project “POWER EXPANSION” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Nicaragua. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Eighth Power Project includes: (1) construction of a generating plant at Puerto Somoza, comprising two steam-electric generating units with an aggregate generating capacity of about 100 MW, fuel unloading and storage facilities, a substation, and personnel housing; (2) construction of about 105 km of 230 kV single-circuit transmission lines; (3) construction of a 230/138 kV substation at Tiscapa including a load dispatch center and of a 230/138 kV substation at Leon and installation of communication, metering and control equipment; (4) construction of about 70 km of 230 kV single-circuit transmission line between Leon and the Honduran border; (5) construction of about 75 km of 138 kV single-circuit transmission line around Managua; (6) construction of a 138 kV substation at Los Braziles and switching bay additions to the existing 138 kV substations at the Managua Thermal Plant and Masaya; (7) construction of about 90 km of 138 kV single-circuit transmission lines from Sebaco to Yalaguina; (8) construction of a stepdown substation at Yalaguina and a switching bay addition to the existing 138 kV substations at Sebaco; (9) a study of improvements in ENALUF's organization, procedures and operating; and (10) additional work resulting from unexpected geological problems.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data