Power Generation Contract with Base Electron
Under construction · United States · Last reported Mar 2026
Source: PR Newswire
Babcock & Wilcox Enterprises, Inc. received full notice to proceed on a $2.4 billion design-build agreement with Base Electron, an independent power producer backed by Applied Digital, to deliver 1.2 gigawatts of new generation capacity. The contract was announced on March 4, 2026, and is part of the power generation project for the AI factory.
- Status
- Under Construction
- Sector
- Manufacturing (Industrial), Power Generation (CCGT)
- Location
- United States of America
- Updated
- 22 Jul 2026
- Source
- PR Newswire
ConstructChat
Ask ConstructChat about Power Generation Contract with Base Electron
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Babcock & Wilcox Enterprises, Inc. received full notice to proceed on a $2.4 billion design-build agreement with Base Electron, an independent power producer backed by Applied Digital, to deliver 1.2 gigawatts of new generation capacity. The contract was announced on March 4, 2026, and is part of the power generation project for the AI factory. |
Original sector | Energy |
Budget |
Location
Country | United States of America (USA) |
Source
Source | PR Newswire |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Power Generation (CCGT) |
Article published date | 2026-05-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
