logo

POWER GENERATION I

Sector: Power Transmission • Location: Yugoslavia, former

Source: World Bank Group

Project
Closed

The project is part of a long range plan to develop the Neretva River in the Republic of Bosnia-Herzegovina, one of the republics of Yugoslavia most endowed with hydro power potential and one of the country's major energy producers for the national interconnected transmission network, but one of economically least developed republics. The project consists of three concrete gravity dams in continuo

Project Information FAQ

Project Information

5 Q
The project “POWER GENERATION I” is an infrastructure initiative in the Power Transmission sector, located in Yugoslavia, former. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project is part of a long range plan to develop the Neretva River in the Republic of Bosnia-Herzegovina, one of the republics of Yugoslavia most endowed with hydro power potential and one of the country's major energy producers for the national interconnected transmission network, but one of economically least developed republics. The project consists of three concrete gravity dams in continuous cascade on the Neretva river and their associated power stations and transmission links. The installed capacities would be 116 MW, 205 MW, and 65 MW, respectively. The proposed loan is aimed at assisting the economic development of the republic, as well as the development of Yugoslavia's hydro resources (Yugoslavia's second largest energy source next to coal and lignite). The project is designed to meet the need for peaking capacity at least cost and improve the thermal/hydro plant mix within the republic. The proposed borrower for this loan, EBH, the republic apex power sector organization, is a borrower under the Bank's First and Second Power Transmission Loans (Loan Numbers 836-YU and 1469-YU) and the institution-building efforts under these loans would be reinforced through this proposed loan.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data