logo
ProjectRepaying

Power Grid Enhancement Project

Sector: Power Generation (CCGT) • Location: Georgia

Source: European Bank for Reconstruction and Development (EBRD)

The Power Grid Enhancement Project is being developed by the Georgian State Electrosystem (GSE). It comprises the construction of new and in some cases rehabilitation of existing electricity transmission lines and substations.

The purpose of the Project is to strengthen the power transmission grid in Georgia, improve cross border trade opportunities, meet increased power demands and connect exist

Status
Under Construction
Sector
Power Generation (CCGT), Power Transmission, Wind, Hydro, Government, Commercial, Road, Residential
Location
Georgia
Updated
22 Jul 2026
Source
European Bank for Reconstruction and Development (EBRD)

ConstructChat

Ask ConstructChat about Power Grid Enhancement Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Power Grid Enhancement Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Georgia. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Participants

Not available for this record.

Status

Original status

repaying

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Power Grid Enhancement Project is being developed by the Georgian State Electrosystem (GSE). It comprises the construction of new and in some cases rehabilitation of existing electricity transmission lines and substations. The purpose of the Project is to strengthen the power transmission grid in Georgia, improve cross border trade opportunities, meet increased power demands and connect existing and planned power projects. The Project consists of the four main components: (1) Construction of the 500 kV overhead line (OHL) Tskaltubo-Akhaltsikhe-Tortum; (2) Construction of the North Ring; (3) Reinforcement of the transmission infrastructure in Guria region; (4) Reinforcement of the transmission infrastructure in Kakheti region The ESIA has been updated fallowing stakeholder feedback received during the disclosure period. The ESIA documents will continue to be refined and updated as the project progresses. ESIA Package English Volumes 1 – 8 and ESAP in Zip Format ESIA Package Georgian Volumes 1 – 8 and ESAP in Zip Format Full ESIA availability Full ESIA documentation for components expected to be financed by EBRD will be made available locally at: Regions and Municipalities Imereti Regional Governor Office 3 Rustaveli street, Kutaisi, Georgia + 995 431 24 70 00 And Tskaltubo Municipality 25, Rustaveli street, Tskaltubo, Georgia + 995 595 95 90 72 And Tyibuli Municipality 3 Karlo Lomadze Square, Tkibuli, Georgia +995  497 22 20 20 Samegrelo-Zemo Svaneti Regional Governor Office Zviad Gamsakhurdia Avenue, Zugdidi, Georgia, + 995 412 25 05 05 And Mestia Municipality Setis Square, Mestia, Georgia, + 995 595 08 95 30 Racha Lechkhumi- Lower Svaneti Regional Governor Office Ambrolauri, 11 Bratislava-Racha street, + 995 0439 22 18 80 And Lentekhi Municipality 24 King Tamar street, Lentekhi, Georgia + 995 591 812 361 And Tsageri Municipality 58 Rustaveli street, Tsageri, Georgia + 995 599 18 24 25 And Ambrolauri Municipality 11 Bratislava-Racha street, Ambrolauri, Georgia + 995 0439 22 19 37 And Oni Municipality 40 David Aghmashenebeli Avenue, Oni, Georgia + 995 577 377 871 Georgian State Electrosystem Office 2 Baratashvili street, Tbilisi 0105, Georgia + 995 32 2 510 837 And EBRD Resident Office, Merani Business Center, 31a Griboedov Street, 6th Floor, Tbilisi, Georgia. Tel: +995 32 2447400 And Client website Environmental or social enquiries Georgian State Electrosystem (GSE) Zezva Khvedelidze International Project Environmental Coordinator 2 Baratashvili street, Tbilisi 0105, Georgia zezva.khvedelidze@gse.com.ge www.gse.com.ge +995 32 2 510 837 (ext. 461)

Original sector

Energy

Budget

Location

Country

Georgia

Source

Source

European Bank for Reconstruction and Development (EBRD)

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Power Transmission, Wind, Hydro, Government, Commercial, Road, Residential

Article published date

2026-06-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project