POWER I
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The proposed loan would increase electricity generating capacity by helping finance construction of two 220 MW units at the Hwange Thermal Power Station and a transmission line. In addition, the loan would finance engineering consulting services, electricity tariff structure and energy pricing study. The project would enable Zimbabwe to meet the power demand up to the end of 1986.
- Status
- Closed
- Sector
- Power Generation (CCGT), Manufacturing (Industrial), Geothermal, Government
- Location
- Zimbabwe
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about POWER I
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed loan would increase electricity generating capacity by helping finance construction of two 220 MW units at the Hwange Thermal Power Station and a transmission line. In addition, the loan would finance engineering consulting services, electricity tariff structure and energy pricing study. The project would enable Zimbabwe to meet the power demand up to the end of 1986. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | Zimbabwe |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Manufacturing (Industrial), Geothermal, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
