POWER I
Sector: Water Supply and Storage • Location: Korea, Republic of
Source: World Bank Group
The project constitutes the next logical step in KECO's power development program to meet the load growth up to 1986. It would provide for the installation of two 500 MW coal/oil-fired units and associated auxiliary equipment; coal handling and storage facilities, fuel oil tanks, ash system and storage area; a fuel unloading dock for ships of up to 100,000 DWT displacement; a pumping station and a
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project constitutes the next logical step in KECO's power development program to meet the load growth up to 1986. It would provide for the installation of two 500 MW coal/oil-fired units and associated auxiliary equipment; coal handling and storage facilities, fuel oil tanks, ash system and storage area; a fuel unloading dock for ships of up to 100,000 DWT displacement; a pumping station and a 17 km steel pipe to transport fresh water to the station; and a 160 km double circuit, 345 KV transmission line between the power station and Seoul, and related terminal substations and management consulting services. The project will enable KECO to meet part of the increased demand of the interconnected system from 1984. It is expected that the project will help to improve KECO's planning, organization, finances and the structure of electricity rates. An important benefit is the introduction of advanced technology to Korea, through the participation of local manufacturers in association with foreign companies, in the manufacture of some of the main equipment. No major risks are expected to be encountered during the construction of the project. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
