POWER I
One of 8,530 projects Taiyo tracks in Korea, Republic of.
Source: World Bank Group
The project constitutes the next logical step in KECO's power development program to meet the load growth up to 1986. It would provide for the installation of two 500 MW coal/oil-fired units and associated auxiliary equipment; coal handling and storage facilities, fuel oil tanks, ash system and storage area; a fuel unloading dock for ships of up to 100,000 DWT displacement; a pumping station and a
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Oil and Gas, Steel, Geothermal, Metal, Commercial, Government
- Location
- South Korea
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about POWER I
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project constitutes the next logical step in KECO's power development program to meet the load growth up to 1986. It would provide for the installation of two 500 MW coal/oil-fired units and associated auxiliary equipment; coal handling and storage facilities, fuel oil tanks, ash system and storage area; a fuel unloading dock for ships of up to 100,000 DWT displacement; a pumping station and a 17 km steel pipe to transport fresh water to the station; and a 160 km double circuit, 345 KV transmission line between the power station and Seoul, and related terminal substations and management consulting services. The project will enable KECO to meet part of the increased demand of the interconnected system from 1984. It is expected that the project will help to improve KECO's planning, organization, finances and the structure of electricity rates. An important benefit is the introduction of advanced technology to Korea, through the participation of local manufacturers in association with foreign companies, in the manufacture of some of the main equipment. No major risks are expected to be encountered during the construction of the project. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | South Korea |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Oil and Gas, Steel, Geothermal, Metal, Commercial, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
