POWER II (MARSYANGDI
Sector: Water Supply and Storage • Location: Nepal
Source: World Bank Group
The Marsyangdi Hydroelectric Power Project seeks to meet the forecasted demand for electricity in Nepal for the medium term and to strengthen the Borrower's power sector. This will be a run-of-river hydroelectric power project, with an installed capacity of 69 MW, located on the Marsyangdi River. Major project components include diversion works and diversion weir, headrace and tailrace tunnels, po
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Commercial, Government
- Location
- Nepal
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about POWER II (MARSYANGDI
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Marsyangdi Hydroelectric Power Project seeks to meet the forecasted demand for electricity in Nepal for the medium term and to strengthen the Borrower's power sector. This will be a run-of-river hydroelectric power project, with an installed capacity of 69 MW, located on the Marsyangdi River. Major project components include diversion works and diversion weir, headrace and tailrace tunnels, powerhouse, transmission lines, substations and equipment. The project also provides for consulting engineers, technical assistance and training. A primary benefit will be derived from the generation of additional electricity for industrial, commercial and domestic consumption, and for irrigation purposes. Benefits will also be received through improvement of the distribution system, enhancement of maintenance capacity and the training of manpower. Some risk relates to possible deficient design and construction, poor management and cost overruns. Appointment of a panel of experts to review design and construction, adequate provision for supervision in close cooperation with the consulting engineer, and assignment of a claims advisor should help minimize these risks. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | Nepal |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Commercial, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
