logo

POWER II (MARSYANGDI

Sector: Water Supply and Storage • Location: Nepal

Source: World Bank Group

Project
Closed

The Marsyangdi Hydroelectric Power Project seeks to meet the forecasted demand for electricity in Nepal for the medium term and to strengthen the Borrower's power sector. This will be a run-of-river hydroelectric power project, with an installed capacity of 69 MW, located on the Marsyangdi River. Major project components include diversion works and diversion weir, headrace and tailrace tunnels, po

Project Information FAQ

Project Information

5 Q
The project “POWER II (MARSYANGDI” is an infrastructure initiative in the Water Supply and Storage sector, located in Nepal. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Marsyangdi Hydroelectric Power Project seeks to meet the forecasted demand for electricity in Nepal for the medium term and to strengthen the Borrower's power sector. This will be a run-of-river hydroelectric power project, with an installed capacity of 69 MW, located on the Marsyangdi River. Major project components include diversion works and diversion weir, headrace and tailrace tunnels, powerhouse, transmission lines, substations and equipment. The project also provides for consulting engineers, technical assistance and training. A primary benefit will be derived from the generation of additional electricity for industrial, commercial and domestic consumption, and for irrigation purposes. Benefits will also be received through improvement of the distribution system, enhancement of maintenance capacity and the training of manpower. Some risk relates to possible deficient design and construction, poor management and cost overruns. Appointment of a panel of experts to review design and construction, adequate provision for supervision in close cooperation with the consulting engineer, and assignment of a claims advisor should help minimize these risks.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data