POWER II (MARSYANGDI
Sector: Water Supply and Storage • Location: Nepal
Source: World Bank Group
The Marsyangdi Hydroelectric Power Project seeks to meet the forecasted demand for electricity in Nepal for the medium term and to strengthen the Borrower's power sector. This will be a run-of-river hydroelectric power project, with an installed capacity of 69 MW, located on the Marsyangdi River. Major project components include diversion works and diversion weir, headrace and tailrace tunnels, po
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Marsyangdi Hydroelectric Power Project seeks to meet the forecasted demand for electricity in Nepal for the medium term and to strengthen the Borrower's power sector. This will be a run-of-river hydroelectric power project, with an installed capacity of 69 MW, located on the Marsyangdi River. Major project components include diversion works and diversion weir, headrace and tailrace tunnels, powerhouse, transmission lines, substations and equipment. The project also provides for consulting engineers, technical assistance and training. A primary benefit will be derived from the generation of additional electricity for industrial, commercial and domestic consumption, and for irrigation purposes. Benefits will also be received through improvement of the distribution system, enhancement of maintenance capacity and the training of manpower. Some risk relates to possible deficient design and construction, poor management and cost overruns. Appointment of a panel of experts to review design and construction, adequate provision for supervision in close cooperation with the consulting engineer, and assignment of a claims advisor should help minimize these risks. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
