logo
ProjectClosed

POWER II (MARSYANGDI

Sector: Water Supply and Storage • Location: Nepal

Source: World Bank Group

The Marsyangdi Hydroelectric Power Project seeks to meet the forecasted demand for electricity in Nepal for the medium term and to strengthen the Borrower's power sector. This will be a run-of-river hydroelectric power project, with an installed capacity of 69 MW, located on the Marsyangdi River. Major project components include diversion works and diversion weir, headrace and tailrace tunnels, po

Status
Closed
Sector
Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Commercial, Government
Location
Nepal
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about POWER II (MARSYANGDI

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “POWER II (MARSYANGDI” is an infrastructure initiative in the Water Supply and Storage sector, located in Nepal. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Marsyangdi Hydroelectric Power Project seeks to meet the forecasted demand for electricity in Nepal for the medium term and to strengthen the Borrower's power sector. This will be a run-of-river hydroelectric power project, with an installed capacity of 69 MW, located on the Marsyangdi River. Major project components include diversion works and diversion weir, headrace and tailrace tunnels, powerhouse, transmission lines, substations and equipment. The project also provides for consulting engineers, technical assistance and training. A primary benefit will be derived from the generation of additional electricity for industrial, commercial and domestic consumption, and for irrigation purposes. Benefits will also be received through improvement of the distribution system, enhancement of maintenance capacity and the training of manpower. Some risk relates to possible deficient design and construction, poor management and cost overruns. Appointment of a panel of experts to review design and construction, adequate provision for supervision in close cooperation with the consulting engineer, and assignment of a claims advisor should help minimize these risks.

Original sector

(Historic)Electric Power & Other Energy

Location

Country

Nepal

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Commercial, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project