logo
ProjectClosed

POWER II

Sector: Power Generation (CCGT) • Location: Zimbabwe

Source: World Bank Group

The Kariba Hydroelectric Project in Rhodesia and Nyasaland will provide a generating capacity of 500 mw with a yearly capability of 3,500 to 4,000 million kw. It will be developed in two stages: a) to reach a capacity of 500 mw, and (b) a capability of 4 billion kw per year. The complete development will have a capacity of 1,200 mw with a firm ability of 8 billion kw per year. A nationwide grid wi

Status
Closed
Sector
Power Generation (CCGT), Hydro, Government
Location
Zimbabwe
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about POWER II

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “POWER II” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Zimbabwe. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Kariba Hydroelectric Project in Rhodesia and Nyasaland will provide a generating capacity of 500 mw with a yearly capability of 3,500 to 4,000 million kw. It will be developed in two stages: a) to reach a capacity of 500 mw, and (b) a capability of 4 billion kw per year. The complete development will have a capacity of 1,200 mw with a firm ability of 8 billion kw per year. A nationwide grid will be built as a part of the project, and will interconnect the major load centers in the Federation of Rhodesia and Nyasaland. It is confronted with the problem of quickly developing large amounts of power to meet a rapidly increasing demand. This requirement results from the continued expansion of the rapid pace of over all economic development.

Original sector

(Historic)Electric Power & Other Energy

Location

Country

Zimbabwe

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Hydro, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project