logo

POWER II

Sector: Water Supply and Storage • Location: Fiji

Source: World Bank Group

Project
Closed

The Second Power Project consists of (a) heightening of the Monasavu dam (part of the first power project) by 15 m to double its storage; (b) construction of two small diversion weirs and about 4.0 km of concrete-lined tunnels of 2.75 m diameter to divert the flow of two neighboring streams (Wainambua and Wainaka) into the Monasavu reservoir; (c) extension of civil works of the Wailoa power statio

Status
Closed
Sector
Water Supply and Storage, Power Generation (CCGT), Hydro, Cement, Commercial, Government
Location
Fiji
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about POWER II

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “POWER II” is an infrastructure initiative in the Water Supply and Storage sector, located in Fiji. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Second Power Project consists of (a) heightening of the Monasavu dam (part of the first power project) by 15 m to double its storage; (b) construction of two small diversion weirs and about 4.0 km of concrete-lined tunnels of 2.75 m diameter to divert the flow of two neighboring streams (Wainambua and Wainaka) into the Monasavu reservoir; (c) extension of civil works of the Wailoa power station (also part of the first power project) to its ultimate capacity (80 MW); (d) installation of the third and fourth generating sets (20 MW each) and associated electrical equipment at the Wailoa power station; and (e) provision for overseas training of FEA's operators and extension of training facilities. The project forms part of FEA's program to increase the scope of Fiji's hydroelectric generation and further reduce Fiji's dependence on imported energy resources. Co-financing is being arranged with the Commonwealth Development Corporation (CDC), the European Investment Bank (EIB) and a group of commercial banks. There are no unusual risks associated with the project other than those inherent in all hydroelectric projects such as possible geological problems and hydrological complexities.

Original sector

(Historic)Electric Power & Other Energy

Location

Country

Fiji

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Hydro, Cement, Commercial, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project