POWER II
Sector: Water Supply and Storage • Location: Fiji
Source: World Bank Group
The Second Power Project consists of (a) heightening of the Monasavu dam (part of the first power project) by 15 m to double its storage; (b) construction of two small diversion weirs and about 4.0 km of concrete-lined tunnels of 2.75 m diameter to divert the flow of two neighboring streams (Wainambua and Wainaka) into the Monasavu reservoir; (c) extension of civil works of the Wailoa power statio
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Hydro, Cement, Commercial, Government
- Location
- Fiji
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about POWER II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Second Power Project consists of (a) heightening of the Monasavu dam (part of the first power project) by 15 m to double its storage; (b) construction of two small diversion weirs and about 4.0 km of concrete-lined tunnels of 2.75 m diameter to divert the flow of two neighboring streams (Wainambua and Wainaka) into the Monasavu reservoir; (c) extension of civil works of the Wailoa power station (also part of the first power project) to its ultimate capacity (80 MW); (d) installation of the third and fourth generating sets (20 MW each) and associated electrical equipment at the Wailoa power station; and (e) provision for overseas training of FEA's operators and extension of training facilities. The project forms part of FEA's program to increase the scope of Fiji's hydroelectric generation and further reduce Fiji's dependence on imported energy resources. Co-financing is being arranged with the Commonwealth Development Corporation (CDC), the European Investment Bank (EIB) and a group of commercial banks. There are no unusual risks associated with the project other than those inherent in all hydroelectric projects such as possible geological problems and hydrological complexities. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | Fiji |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Hydro, Cement, Commercial, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
