POWER II
Sector: Water Supply and Storage • Location: Kenya
Source: World Bank Group
The project comprises: (a) a rock and earthfill type diversion dam, with integral spillway, vertical intake shafts with short headrace tunnels to the underground power station; (b) an underground power station designed for three 67 MW generating sets driven by Francis turbines, with two sets installed under the project; the head is approximately 136 m; (c) a partially lined tailrace tunnel about 4
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Tunnel, Government, Hydro
- Location
- Kenya
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about POWER II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project comprises: (a) a rock and earthfill type diversion dam, with integral spillway, vertical intake shafts with short headrace tunnels to the underground power station; (b) an underground power station designed for three 67 MW generating sets driven by Francis turbines, with two sets installed under the project; the head is approximately 136 m; (c) a partially lined tailrace tunnel about 4,700 m long emptying into the Kindaruma reservoir; (d) a 275 kV single circuit transmission line from Kamburu to just outside Nairobi (105 m). This line will operate initially at 132 kV; and (e) a management review and a study of the tariff structure. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | Kenya |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Tunnel, Government, Hydro |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Kenya
- Acquisition of equipment and Facilities for expansion of hospitality project
- LAKE CHALLA INTEGRATED WATER RESOURCE DEVELOPMENT PROJECT
- DEVELOPMENT OF LOWER TURKWEL IRRIGATION PROJECT UNDER SUGARCANE PRODUCTION
- M-SAFI WASTE EXPERTS
- Ewaso Ng'iro Tannery and Leather Factory
- Oserian Two Lakes Industrial Park
- Bamboo Commercialization
- Tea Factory
