POWER II
Sector: Power Generation (CCGT) • Location: Sierra Leone
Source: World Bank Group
The bank's project, estimated to cost about $4.8 million, would consist of the installation of one 6.6 MW diesel electric generator at the King Tom power station and the expansion of the distribution system in Freetown; the installation of three 1000 KW diesel electric generators and the expansion of the distribution system in the town of Kenema; and the installation of two 1000 KW diesel electric
- Status
- Closed
- Sector
- Power Generation (CCGT), Geothermal, Government
- Location
- Sierra Leone
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about POWER II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The bank's project, estimated to cost about $4.8 million, would consist of the installation of one 6.6 MW diesel electric generator at the King Tom power station and the expansion of the distribution system in Freetown; the installation of three 1000 KW diesel electric generators and the expansion of the distribution system in the town of Kenema; and the installation of two 1000 KW diesel electric generators and the expansion of the distribution system in the town of Koidu. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | Sierra Leone |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Geothermal, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
