POWER II
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The project, which would be carried out and operated by the Swaziland Electricity Board, consists of two parts, A and B, the second of which is dependent on the signing of a supply agreement with the Usutu Pulp Company before August 31, 1967. Part A would be the extension of the existing power station at Edwaleni by the installation of about 5 MW of diesel driven and about 5 MW of water driven gen
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Hydro, Government
- Location
- Eswatini
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about POWER II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project, which would be carried out and operated by the Swaziland Electricity Board, consists of two parts, A and B, the second of which is dependent on the signing of a supply agreement with the Usutu Pulp Company before August 31, 1967. Part A would be the extension of the existing power station at Edwaleni by the installation of about 5 MW of diesel driven and about 5 MW of water driven generating plants and ancillary facilities and the construction of a hydroelectric power station of about 6.5 MW capacity at Magaduza three miles downstream of Edwaleni, together with the necessary ancillary equipment. Part B would be the construction of a 66 kv transmission line from Edwaleni to Mhlambanyati with stepdown substations at Mhlambanyati and at the Usutu Pulp Company's factory, requiring foreign exchange expenditures of $250,000. The proposed project is the most economical way to meet the expected demand. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | Eswatini |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Hydro, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Eswatini
- Swaziland- Mbabane Manzini corridor (Nondvo) multipurpose dam study
- FirstRand Rest of Africa Central Bank Mandatory Reserves Coverage
- Eswatini - Mkhondvo-Ngwavuma Water Augmentation Program Phase IA (MNWAP-1A)
- Eswatini - Komati Downstream Development Project (KDDP)
- Eswatini - Lower Usuthu Smallholder Irrigation Project Preliminary Studies Phase II
- Eswatini - Manzini Region Water Supply and Sanitation Project
- Lupohlo-Ezulwini Hydro Power
- Eswatini - Mkondvo-Ngwavuma Water Augmentation Program (MNWAP) Study