logo

POWER II

Sector: Water Supply and Storage • Location: Eswatini

Source: World Bank Group

Project
Closed

The project, which would be carried out and operated by the Swaziland Electricity Board, consists of two parts, A and B, the second of which is dependent on the signing of a supply agreement with the Usutu Pulp Company before August 31, 1967. Part A would be the extension of the existing power station at Edwaleni by the installation of about 5 MW of diesel driven and about 5 MW of water driven gen

Project Information FAQ

Project Information

5 Q
The project “POWER II” is an infrastructure initiative in the Water Supply and Storage sector, located in Eswatini. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project, which would be carried out and operated by the Swaziland Electricity Board, consists of two parts, A and B, the second of which is dependent on the signing of a supply agreement with the Usutu Pulp Company before August 31, 1967. Part A would be the extension of the existing power station at Edwaleni by the installation of about 5 MW of diesel driven and about 5 MW of water driven generating plants and ancillary facilities and the construction of a hydroelectric power station of about 6.5 MW capacity at Magaduza three miles downstream of Edwaleni, together with the necessary ancillary equipment. Part B would be the construction of a 66 kv transmission line from Edwaleni to Mhlambanyati with stepdown substations at Mhlambanyati and at the Usutu Pulp Company's factory, requiring foreign exchange expenditures of $250,000. The proposed project is the most economical way to meet the expected demand.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data