POWER II
Sector: Water Supply and Storage • Location: Eswatini
Source: World Bank Group
The project, which would be carried out and operated by the Swaziland Electricity Board, consists of two parts, A and B, the second of which is dependent on the signing of a supply agreement with the Usutu Pulp Company before August 31, 1967. Part A would be the extension of the existing power station at Edwaleni by the installation of about 5 MW of diesel driven and about 5 MW of water driven gen
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project, which would be carried out and operated by the Swaziland Electricity Board, consists of two parts, A and B, the second of which is dependent on the signing of a supply agreement with the Usutu Pulp Company before August 31, 1967. Part A would be the extension of the existing power station at Edwaleni by the installation of about 5 MW of diesel driven and about 5 MW of water driven generating plants and ancillary facilities and the construction of a hydroelectric power station of about 6.5 MW capacity at Magaduza three miles downstream of Edwaleni, together with the necessary ancillary equipment. Part B would be the construction of a 66 kv transmission line from Edwaleni to Mhlambanyati with stepdown substations at Mhlambanyati and at the Usutu Pulp Company's factory, requiring foreign exchange expenditures of $250,000. The proposed project is the most economical way to meet the expected demand. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in Eswatini
- FirstRand Rest of Africa Central Bank Mandatory Reserves Coverage
- Swaziland- Mbabane Manzini corridor (Nondvo) multipurpose dam study
- Eswatini - Mkhondvo-Ngwavuma Water Augmentation Program Phase IA (MNWAP-1A)
- Eswatini - Mkhondvo-Ngwavuma Water Augmentation Program Phase IA (MNWAP-1A)
- Eswatini - Komati Downstream Development Project (KDDP)
- Eswatini - Lower Usuthu Smallholder Irrigation Project Preliminary Studies Phase II
- Eswatini - Manzini Region Water Supply and Sanitation Project
- Lupohlo-Ezulwini Hydro Power
