logo
ProjectClosed

POWER II

The status, timeline and source of this project. A free account opens every field.

Source: World Bank Group

The project, which would be carried out and operated by the Swaziland Electricity Board, consists of two parts, A and B, the second of which is dependent on the signing of a supply agreement with the Usutu Pulp Company before August 31, 1967. Part A would be the extension of the existing power station at Edwaleni by the installation of about 5 MW of diesel driven and about 5 MW of water driven gen

Status
Closed
Sector
Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Hydro, Government
Location
Eswatini
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about POWER II

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “POWER II” is an infrastructure initiative in the Water Supply and Storage sector, located in Eswatini. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project, which would be carried out and operated by the Swaziland Electricity Board, consists of two parts, A and B, the second of which is dependent on the signing of a supply agreement with the Usutu Pulp Company before August 31, 1967. Part A would be the extension of the existing power station at Edwaleni by the installation of about 5 MW of diesel driven and about 5 MW of water driven generating plants and ancillary facilities and the construction of a hydroelectric power station of about 6.5 MW capacity at Magaduza three miles downstream of Edwaleni, together with the necessary ancillary equipment. Part B would be the construction of a 66 kv transmission line from Edwaleni to Mhlambanyati with stepdown substations at Mhlambanyati and at the Usutu Pulp Company's factory, requiring foreign exchange expenditures of $250,000. The proposed project is the most economical way to meet the expected demand.

Original sector

(Historic)Electric Power & Other Energy

Location

Country

Eswatini

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Hydro, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project